Processes carried out as part of the project by Westbury Park Engineering included fully detailed to house pipe work, full fabrication, proof load testing to 10.5 tonnes, a full fit out of electrical components and valves along with hydrostatic tests, factory acceptance tests and pressure tests.

  • Scope of Supply: 7 Propane Pump Skids
  • Size: 9m x 3.5m x 3m
  • Weight: 6000 – 7500 kg each
  • Materials: Carbon Steel S355J2, S355J0
  • Project location: Nigeria