Access for All Railway Station Project
At Westbury Park Engineering, we pride ourselves on delivering complex projects within tight timeframes while maintaining exceptional dimensional accuracy. These core strengths—highly valued by our clients—are clearly demonstrated in our Access for All railway station project, where precision and expertise were critical throughout.
The entire project was successfully completed in just three months, including the fabrication and installation of bespoke stainless steel handrails, showcasing our efficiency without compromising on quality.
Scope of Works
- 3 × Two-tier staircases – 52.2 tonnes
- 3 × Lift shafts – 22.1 tonnes
- 2 × Link bridges – 42.8 tonnes
- 6 × Trestle supports – 18 tonnes
- 3 × Landing lobbies – 16 tonnes
Total project weight: 151.1 tonnes
Delivering Excellence
This project highlights our capability to manage large-scale, technically demanding steelwork packages while meeting strict deadlines and exacting tolerances. From design to completion, our team ensured precision engineering at every stage.
Enquire Now
If you’re looking for a reliable partner to deliver high-quality engineering solutions on time and to specification, get in touch with Westbury Park Engineering today.